(상단)주메뉴 바로가기 (왼쪽)하위메뉴 바로가기 본문 바로가기 하단(Copyright) 바로가기

KAIST는[Travel] 세상을 향해 자유롭게 발을 내딛는 KAIST는 나의 길을 찾아 떠나는 여행이다

홈페이지가이드 Homepage Guide

KAIST stadium remodeled

작성자 : 관리자 등록일 : 2006-09-18 조회수 : 8469 메일 : webmaster@kaist.ac.kr

KAIST stadium remodeled

 

KAIST stadium was reopened on last Thursday, September 14 after its 1.2 billion won-paid remodeling, which equipped the stadium with international standard soccer field, urethane running track, and inline skating track.

■ Main facilities

- Urethane running track

(straight track: 6 lanes, 100 meter-long/ corner track: 4 lanes, 400 meter-long)

- Inline skating track (Width: 4.9m)

- International standard artificial turf soccer field (drainage plate method employed)

- Four night light towers

- Total 1,530 seats installed in the stand

- Shower booths and modern-style toilets

■ Total construction cost: 1.2 billion won

- 0.3 billion won from Seoul Olympic Sports Promotion Foundation (assistance fund),

- 0.9 billion won from KAIST budget

■ Features

- Day/night, all weather, and full-season available

- Artificial turf soccer field employing drainage plate method will reduce about 290 million won from the budget.

파일 :

개인정보처리방침이메일주소집단수집거부

34141 대전광역시 유성구 대학로 291 한국과학기술원(KAIST) / T.042-350-2114 / F.042-350-2210(2220)

Copyright (C) 2014, Korea Advanced Institute of Science and Technology, All Rights Reserved.

Web Accessibility 인스타그램 유튜브 KAIST트위터 KAIST페이스북 정부 3.0